Scope of Work includes, but is not limited to the following: 1. Demolish and replace existing C1, C25, C88 (Terminal only), C92 (Terminal only), and C96 Baggage Handling Systems (BHS). 2. Construct the final BHS sortation matrix in the north main terminal. 3. Provide layout, electrical supply power, communications, and integration to the BHS conveyor and controls of the Transportation Security Administration (TSA) provided explosive detection system (EDS) machines in the Basement Level. This consists of two (2) new EDS pods with two (2) machines in each pod. 4. Demolish and replace the entire C25 BHS through the underground tunnel to the Ramp level at the South Satellite. This adds additional outbound lines in the existing baggage tunnel, replaces two (2) makeup units, provide automatic tag readers (ATR) and crossovers and demolishes the existing claims in the Federal Inspection Services (FIS) area.