Specifications include, but are not limited to: The Contractor shall furnish and install approximately 572 lineal feet of 8-inch UV Cured-In- Place Pipe (CIPP) to rehabilitate existing sanitary sewer mains and associated laterals. The CIPP is to be designed for fully deteriorated gravity flow conditions. The work consists of furnishing all labor, equipment, materials, and incidentals required to rehabilitate the existing sewer mains with UV CIPP. This work will also include customer notification, bypass pumping, cleaning, root and sediment removal, initial Closed Circuit Television (CCTV) inspection and assessment, UV CIPP installation and testing, reinstatement of all laterals, testing, and final CCTV inspection.