Specifications include, but are not limited to: The construction of a new closed pipe storm drain system to replace the existing stormwater 8-feet wide by 5-feet-deep wooden and concrete box culvert along Beech Street from 21st Avenue to 28th Avenue. The project includes surveying, traffic control, demolition of structures and pavement, fifty-two hundred and ten (5210) linear feet of corrugated polyethylene storm sewer pipe, seventeen (17) manholes, twenty-eight (28) catch basins, two (2) precast reinforced concrete drainage structures, cement concrete pavement, cement concrete sidewalk and ramps, pavement markings, street trees, electrical conduit and junc tion-boxes, and other work, all in accord ance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.