Specifications include, but are not limited to: 1. In-ground Interment a. Add 990 standard sized double depth vaults. b. Add 20 oversized double depth vaults. c. Temporary fencing with screening of burial area. d. Temporary irrigation to allow watering of non-effected areas. 2. In-ground Inurnment a. Develop two in-ground inurnment areas adjacent to the expanded access road listed below in item #3. b. Sift soils in new burial area to clean out boulders and large rocks that impact future placement. c. Add irrigation to support new inurnment areas. 3. Interior Road Expansion a. Develop west loop from committal shelter to flag assembly area. This is to allow access to west side of existing and new in-ground interment areas to be developed in item #1 and in-ground inurnment areas to be developed in item #2. 4. Memorial Walls a. Add two additional memorial walls (#3 and #4) to replicate memorial walls previously built. This will add a total of 216 markers (108 per wall). 5. Columbarium Wall a. Complete last Columbarium Wall in north columbarium location (Wall G). 6. Generator a. Furnish and install new generator (natural gas) sized to operate administration building, maintenance building, and committal shelter during frequent brown outs. b. Furnish and install automatic transfer switch. 7. Maintenance Facility Shower (or at minimum an emergency wash station) a. Current facility does not have a shower. This request is to protect staff from safety issues that arise from completing the daily tasks