Loading...
Skip to main content
< Back to results

2018 Burke Gilman Trail Repaving Project


Location
Washington
Publication Date
12/05/2018 01:35 PM EST
Closing Date
01/09/2019 05:00 PM EST
Issuing Organization
City of Seattle
Solicitation Number
Description

Specifications include, but are not limited to: This project is to repair specified sections of the highly utilized Burke Gilman Trail, between 30th Ave NE and NE 145th St, that have been impacted by tree roots and will need asphalt removal and replacement. Elements of the Work include, but are not limited to: saw cutting, removing existing asphalt, root pruning, repairing and compacting the sub-grade, placing new asphalt and sealing seams. Additive #1: Repair site locations 7a-f between 40th Ave. NE and 45th Ave NE identified in Exhibit A and as described in the scope of work. Additive #2: Repair site locations 7g-l between NE 63rd St. and NE 70th St. identified in Exhibit A and as described in the scope of work. Additive #3: Repair site locations 7m-o between NE 70th St and NE 77th St, and site location 21a near NE 142nd St. identified in Exhibit A and as described in the scope of work.

Source
https://www.ebidexchange.com/Solicitation.aspx?cid=eb31bf6e-250d-4d1d-abfb-37cb20108045&uid=00000000-0000-0000-0000-000000000000&sid=124609 (opens in a new window)

Get instant access

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Group

Matching bid notifications from participating agencies

Basic

Access participating agency bids