Specifications include, but are not limited to: The project consists of providing and installing a 500,000 gallon pedesphere elevated storage tank, and meter vault in Fluvanna County, VA. This Project is one of three simultaneous projects related to the Zion Crossroads Water and Sewer System Project, the other projects are generally known as the “Water and Sewer System” and the “Water Booster Pump Station and Wastewater Pump Station” (collectively the “Other Projects”). These Other Projects are under separate contracts and Contractor will be responsible for coordination with the Other Projects and associated contractors. The project includes, but is not limited to: A. Construction and installation of a 500,000 gallon pedesphere elevated storage tank. 1. Tank shall have a flow through design with separate inlet and outlet riser pipes. 2. A mixer to ensure complete tank mixing. 3. Cathodic protection of the sacrificial anode design. B. Two (2) below grade meter vaults with strainer, check valve, flow meter, and motorized butterfly valve. 1. Each flow meter will be configured to either meter flow received from or sent to Louisa County. C. Provide electrical service to elevated storage tank. D. Provide site improvements including a gravel site, fencing, and grading away from tank.