Specifications include, but are not limited to: The intent and purpose of this Invitation for Bids (IFB) is to establish a contract through competitive bidding with one qualified vendor to furnish and install a complete wiring infrastructure for voice, video, and data in the Wheeler Mall Steam Tunnel and connecting/terminating in other buildings at Longwood University, an agency of the Commonwealth of Virginia. Work shall consist of providing all materials, labor, supervision, tools, equipment, and incidentals necessary to furnish, install, and render operational a complete cable system consisting of voice, video, and data wiring and termination. 1. The contractor shall install a 400 pair copper outside plant cable from Hiner Hall Vault to Wheeler Lawn Vault. The contractor shall install new splice canisters in both Hiner Hall and Wheeler Lawn Vaults. The new cable shall be spliced to existing 50 pair copper cables at the Wheeler Lawn Vault for the following buildings: Cox Hall, Wheeler Hall, Chichester Science Center, Jarman Hall, and Stevens Hall. Longwood University will provide cable pair counts to be spliced at the locations. 2. The contractor will install a 100 pair copper outside plant cable from existing pigtail splice in Lancaster Hall, room G06, to Hiner Hall Vault splice. 3. The contractor will install a 50 pair copper outside plant cable from existing pigtail splice in Upchurch University Center, room C205A, to Hiner Hall Vault splice. 4. The contractor will install a 96 strand single mode Corning Altos Fiber Optic cable from Coyner Hall, room 003, to Lancaster Hall, room G06. Termination will be LC fusion splice. The contractor will provide and install a wall mount fiber panel in Coyner Hall and a rack mount fiber panel Lancaster Hall.