Specifications include, but are not limited to: A. LONG JUMP #1. The selected vendor shall demolish and remove long jump #1. Long Jump #1 runs east to west and is approximately 144’ X 4’. This long jump is no longer needed and shall be removed by the selected vendor. All existing asphalt/concrete in Long Jump #1 shall be removed from the site and shall be properly disposed of. The Clarke County Maintenance Department will be responsible for seeding the area or laying down sod. B. LONG JUMP #2. The selected vendor shall mill 3” from Long Jump #2 and repair any cracks. Then, the selected vendor shall apply 3” of SM 9.5AL on to Long Jump #2. The selected vendor shall line the long jump area in the same fashion before the work began. C. HIGH JUMP OVERLAY. The High Jump Overlay is approximately 20’ X 40’. The selected vendor shall mill 1.5” off the entire high jump overlay and repair any cracks. Then, the selected vendor shall apply 1.5” of SM 9.5AL asphalt on the entire High Jump Overlay.