Specifications include, but are not limited to: 5. Contractor shall remove and dispose of all dirt, debris, and vegetation from court surface. 6. Contractor shall remove grass and weeds from cracks, fence and perimeter of court surface and apply non-selective herbicide in accordance with the manufacturer’s directions to all growth areas. 7. Contractor shall thoroughly scrape and clean court surface and fence line of all dirt, dust, sand, leaves and any and all other debris and vegetation. Clean out all cracks 1/8” or wider using a 2,500 p.s.i. pressure washer and patch cracks with SportMaster acrylic crack filler (or approved equivalent). Pressure wash discolored areas at low spots. Scrape and remove all loose and flaking material and clean. 8. Contractor will remove or raise fence mesh for appropriate court access prior to resurfacing, store any removed mesh during project and rehang/re-secure mesh on existing frame after resurfacing is complete. No resurfacing products should be on fence fabric.