Specifications include, but are not limited to: The Contractor shall be responsible for the removal of solids generated from the Moore’s Bridges Water Treatment Facility in the amount of approximately 3,800 tons per year. The solids are comprised of residuals from the water treatment process that have been de-watered to approximately 20 to 23% solids. It is composed of naturally occurring lake solids, powdered activated carbon, iron and aluminum. A Toxicity Characteristic Leaching Procedure (“TCLP”) is available upon request. The Contractor shall be responsible for all materials, supervision, labor, equipment, appliances, cleanup, taxes, insurance, permits or fees, mobilization, overhead, mark-ups and profit, in full compliance with all specifications, terms and conditions of this solicitation.