Any Interim Agreement or Comprehensive Agreement will require the Contractor to provide the following Work and services: 1. Provide all design for the SPRS to be installed in accordance with the latest applicable local, state, and federal laws and the regulations and requirements of the Local Utility. Design shall include but not be limited to all load studies and structural modifications for each Facility necessary to accommodate the SPRS. No provision shall be included for sale of generated power to others. 2. Make as few roof penetrations as safety and the functional integrity of the proposed system will permit to reduce risk of leaks and damage to existing roof finishes. Ballasted SPRS are preferred; framed supports for multiple solar photovoltaic panels are acceptable; individually attached solar photovoltaic panels are not acceptable. 3. Obtain all federal, state, and local governmental permits and zoning approvals required for installation and subsequent operation of the SPRS.