Specifications include, but are not limited to: The Work to be done under this Contract consists of: replacement of the trash rake and disposal system, Shockoe crest gate improvements, and arch sewer emergency gate house improvements at the City of Richmond, Virginia, Department of Public Utilities Shockoe Diversion Structure, as described and shown in the contract documents. The Work includes: 1.3.1.1 Furnishing of all labor, material, instrumentation, superintendence, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services and other The Work to be done under this Contract consists of: replacement of the trash rake and disposal system, Shockoe crest gate improvements, and arch sewer emergency gate house improvements at the City of Richmond, Virginia, Department of Public Utilities Shockoe Diversion Structure, as described and shown in the contract documents. The Work includes: 1.3.1.1 Furnishing of all labor, material, instrumentation, superintendence, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services and other The Work to be done under this Contract consists of: replacement of the trash rake and disposal system, Shockoe crest gate improvements, and arch sewer emergency gate house improvements at the City of Richmond, Virginia, Department of Public Utilities Shockoe Diversion Structure, as described and shown in the contract documents. The Work includes: 1.3.1.1 Furnishing of all labor, material, instrumentation, superintendence, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services and other means of construction necessary or proper for the performance and completion of the Work. 1.3.1.2 Sole responsibility for adequacy of plant and equipment. 1.3.1.3 Maintaining the Work area and site in a clean and acceptable manner. 1.3.1.4 Maintaining existing facilities in service at all times except where specifically provided for otherwise herein. 1.3.1.5 Protection of finished and unfinished Work. 1.3.1.6 Repair and restoration of Work damaged during construction. 1.3.1.7 Furnishing as necessary proper equipment and machinery, of a sufficient capacity, to facilitate the Work and to handle all emergencies normally encountered in Work of this character. 1.3.1.8 Furnishing, installing, and protecting all necessary guides, track rails, bearing plates, anchor and attachment bolts, and all other appurtenances needed for the installation of the devices included in the equipment specified. Make anchor bolts of appropriate size, strength and material for the purpose intended. Furnish substantial templates and shop drawings for installation.