Specifications include, but are not limited to: • HVAC will be designed by DPW. • Main Server room will need to be separated from the window. The Town would like to keep the windows. • Anti-static floor or tile floor in the server room. • Install raised floor in the server section, ramp maybe needed for handicap code. • Doors to the server section should be wide and tall enough to fit server racks (Current Doors will need to be relocated). • Electrical to the room should be tied back into the generator. • Proper cable management. • All network fiber will need to be relocated from old server room. • LAN drops throughout the entire data center. • Racks must be properly grounded. • Adequate fire suppression (dry system). • All racks must have UPS and power monitor (we can use some of the UPS we currently have). • Server rack should include KVM’s. • Room size – 24.5’ x 21.5’ approximately 526 sq. ft.