Specifications include, but are not limited to: 1. PERFORM ELECTRICAL TESTING ON STATOR AND SENSORS. 2. CHECK CONDITION OF OIL. 3. CHECK INSPECTION PORT FOR WATER OR OIL. 4. REMOVE VOLUTE AND CHECK WEAR RINGS AND IMPELLER CONDITION. 5. CHECK CONDITION OF MECHANICAL SEALS. 6. DISASSEMBLE PUMP AND RECORD BEARING HOUSING AND SHAFT FITS. 7. CHECK SHAFT OR SHAFT SLEEVE FOR WEAR UNDER SEALS. 8. CHECK CONDITION OF CABLE SEAL ENTRY AND VERIFY CABLE OUTER JACKET IS FREE OF NICKS OR CUTS. 9. CLEAN, PRIMER, AND PAINT ALL PARTS, if applicable. (See Section 2.3 for Paint Requirements.) 10. CLEAN AND BAKE STATOR. 11. ASSEMBLE PUMP. 12. PERFORM FINAL ASSEMBLY TEST ON STATOR AND SENSORS. 13. PERFORM PRESSURE TEST. 14. TEST RUN PUMP DRY, RECORD VOLTAGE AND AMPERAGE