Specifications include, but are not limited to: The Contractor shall be responsible for providing all labor, supervision, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the terms of the contract. The Herndon Fortnightly Library has approximately 8,000 SF of roofing. , and the project specifications. The work includes, but is not limited to the following: • Remove all roofing, flashing, curbs and insulation from the existing roof. • Haul away all debris. • Install new insulation. • Adhere layer of ½” USG Securock board or equivalent over insulation with insulation adhesive. • Install base layer of torch base membrane. • Install Built-Up-Roof (BUR), sub membranes with 4 plies of felt in hot asphalt with gravel surfacing. • Install new cant strip & 2-ply composition base flashings at all vertical wall & curb terminations. • Fabricate and install matching existing new counterflashing using pre-finished steel. • Secure loose battens on dome roof. • Install new lead drain flashings & plumbing vent collars. • Remove and replace and match existing wall coping using pre-finished steel. • Rework & secure electrical conduit at three (3) locations. • Provide 2 year installers warranty. • Provide twenty (20) year manufacturer’s warranty. • Replace all ice shields.