Specifications include, but are not limited to: Construction of a multi-use path from Bridgeview Park to Edgebriar Park, running along North River, and passing under the Main Street Bridge. 1 513 MOBILIZATION LS 1 2 517 CONSTRUCTION SURVEYING LS 1 3 303 EXCAVATION & BORROW @ 15% COMPACTION CY 724 4 508 DEMOLITON AND REMOVAL LS 1 5 200 CONSTRUCTION ENTRANCE EA 2 6 200 SILT FENCE LF 778 7 200 TREE PROTECTION/SAFETY FENCE LF 151 8 414 RIP-RAP, CLASS A1, DRY TN 10 9 602 2” TOPSOIL/FINE GRADING SY 1202 10 603 PERMANENT SEED AND MULCH AC 0.25 11 NS PAVERS SIDEWALK (INCLUDING MORTAR, SAND, SUB-BASE STONE AND CONCRETE BASE) SF 6120 12 512 MAINTENANCE OF TRAFFIC LS 1 13 701 SIGN PANELS SF 40 14 701 SIGN POSTS AND FOUNDATIONS EA 9 15 200 EC-1 OUTLET PROTECTION TN 2 16 606 EC-2 MATTING SY 46 17 606 EC-3 MATTING SY 20 18 309 21B STONE FOR BRIDGE AND CONC. PAD APRONS