Specifications include, but are not limited to: Contractor shall provide all labor, superintendence, materials, tools, equipment, testing,project safety,and other ancillary items necessary as identified to complete the relining of well #8A.Remove pump assembly. Preform alignment testing on 20” steel outer casing. Preform alignment testing on 10” stainless steel screens and carbon steel inner casing. Clean the bottom of the well. Clean gravel from between the existing 20” and 10” casings from approximate depth of 770’ to 780’.Install approximately 780LF. of 16” 304 stainless steel liner casing. Install approximately 150LF of 8” stainless steel screensand extend304 stainless steel casing into the existing 10” stainless steel screens and carbon steel casing approximately 700’ below grade. Install gravel between the 8” and 10” screens.Develop the well screens at a rate of approximately 20’ per hour to tighten up the gravel. Add more gravel if necessary. Cement grout between the 20” and the 16” casings. Reinstall and test the permanent pump assembly.As an option provide a price to replace the 16” stainless with 16” carbon steel. Contractor shall provide a warranty on all work for a period of one (1) year after final completion.Work shall be completedin accordance with VDH and DEQ regulationsfor all work. Pay items noted below.