Specifications include, but are not limited to: 1. Demolition and removal of selected portions of building roof. 2. Hazard materials are not present on site. Refer to lab results by SanAir, dated March 14, 2019 in technical specifications. 3. Verify each existing air-conditioning utilities have been disconnected and capped before starting selective demolition operations and will not disrupt Owner’s operations. 4. Remove any existing utility services and mechanical/electrical systems. Existing services/systems to remain. Refer to section 3.3 of the Technical Specifications for more detail. Store the lightning protection equipment & wiring; reinstall in their original position after completion of the new roof installation. Provide re-certification (meeting original installation requirements) of the lightning protection system. 5. Provide continuous sealant at entire perimeter of roof to stop any water for infiltration of interiors. 6. Provide continuous protection around roof openings for any outside elements from entering the interior with proper material. 7 Provide, install and test new fall anchor installation as part of this project. Include as an allowance of $33,600 for Peak Fall Protection (1230 Perry Road, Apex, NC; 919/387-9965) 8. Contractor is responsible for determining existing conditions for bid proposal. Whereas-built conditions are hidden, Contractor to verify conditions prior to conducting work 9. All new roofing to be warranty compliant.