Specifications include, but are not limited to: Provide all material, freight/transportation, removal of existing hardware, install of new Promethean Board Active Panel systems in 17 classrooms complying with the following: Material Qty Part # Description 30 AP7-B70-NA-1 ActivPanel Titanium 70”-4 pen, Vesa Mount, WIFI Module and cable pack 30 AP70ASW Adjustable Wall Mount System for 70: ActivPanel Touch 2 30 ECS-15-HD ECS-15’ Extend Cabling Solution: HDMI, UXGA, 3.5mm, USB, Wall box, Raceway 30 PRM-CHROMEBOX Promethean Chromebox Uninstall Removal of existing hardware, SMARTBoard, projector, and control box at bottom of board Caulk all openings/penetrations in wall from uninstall with fire caulk. Existing hardware remains with the owner. Install Mount adjustable wall mount system in area vacated by previous hardware. Install adequate supports to hold mount and panel on wall. Attach ActivPanel to wall mount Run cable system from panel to classroom computer and attach all hook ups for video, sound. Concealed wiring if possible. Surface mounted wiring is acceptable. Install sound system associated with ActivPanel to classroom. Protect existing surfaces during install; clean up at end of each work day to maintain safe and clutter free classroom space. Existing sound system needs to remain intact in room and no removal of Extron devices or its components or wall controls. Provide in-service training on use of ActivPanels to selected faculty by 12/13/2019.