Specifications include, but are not limited to:The City’s Westover Swimming Pool Complex consists of three (3) pools – an Olympic pool, diving pool and wading pool. Contractor shall furnish all labor, equipment and materials to perform the work as described in this ITB. All removal and disposal of unusable material shall be included as part of the base bid cost submission. All removal and disposal shall be done according to local, State and Federal codes and laws. All existing equipment, material, buildings, furniture and other items within the immediate vicinity of the pool area where the work is taking place shall be properly covered and protected during each stage of the process. These items are expected to be returned in the same condition as before the project work begins. The City will drain the pool prior to the work beginning. The Contractor will inspect the pool, and plumbing will be pressure tested to confirm it is in good repair. The Contractor shall purchase and utilize SGM Diamond Brite exposed aggregate pool finish for the resurfacing of all three (3) pools noted in the Base Bid. The contractor shall apply Diamond Brite surfacematerial as directed by the manufacturer’s instructions and specifications to the entire pool surface area(s). The Diamond Brite color shall be chosen by the owner from the sample colors that are included in the contractor’s bid package.