Specifications include, but are not limited to: 6.1.1. The Offeror will be responsible for determining cabling distances either by onsite visit or site plan review. 6.1.2. The Offeror is responsible for obtaining any permits in order to fulfill the required terms of this contract, including each job performed hereunder. (Note: The City of Manassas does not typically require permits for low voltage work for MCPS projects. However, should the scope of work include conduit installation and/or other tasks, permits would be required.) 6.1.3. The Offeror will supply all test equipment and resources required in order to provide MCPS with all requisite acceptance testing 6.1.4. The Offeror will dispose of all debris and rubbish from the site that is a direct result of performing any system installation or modification. The Offeror will leave the workspace clean at the end of each workday and all associated materials removed. If the Offeror uses MCPS dumpsters, all cardboard boxes must be broken down (flattened) and all debris sorted and placed into the appropriate containers. Should Offeror not comply with rules regarding dumpsters, they shall be liable for additional charges incurred by MCPS.