Specifications include, but are not limited to:This project is to rehabilitate existing drainage structures, install a storm water detention facility and rehabilitate the automobile parking lot adjacent to the existing airport terminal building. In addition, the existing water and sewer lines to the existing terminal building are to be replaced with new lines originating from nearby municipal water and sewer facilities located in the Village of New Knoxville, Ohio. . Rehabilitate and replace existing automobile parking lot drainage structures to meet ODOT standards. 2. Construct a storm water detention basin capable of detaining storm water runoff and capturing oil and fuel spills from the airport terminal building area pavements. 3. Mill and overlay (approximately 800 TN bituminous asphalt material) the existing airport terminal building automobile parking lot. Bituminous asphalt are to be constructed per ODOT standard specifications. 4. Construct approximately 3,350 LF new 12” gravity sanitary sewer with manholes and laterals from the Village of New Knoxville sanitary sewer receiving facility to the existing airport terminal building. 5. Construct approximately 2,200 LF new 12” waterline, laterals, tees, valves and fire hydrants from the nearby Village of New Knoxville municipal water line to the existing airport terminal building. 6. Include other miscellaneous construction items related to sanitary sewer, municipal waterline, automobile parking lot and storm water detention basin construction.