Specifications include, but are not limited to: The Contractor shall furnish all necessary labor, transportation, parking fees, tools‐of‐the‐trade including specialized diagnostic testing equipment, consumable supplies (including, by way of illustration and not limitation, lubrication, solder, caulking, tape, wire nuts, fasteners, gases, belts and other consumable items) and materials as required to provide comprehensive preventive maintenance on all mission critical building systems listed herein. The equipment listed in Schedule A represents current County inventory covered by this Contract. The Contractor shall provide emergency on‐call response, repairs, testing, replacement, and installation services for the equipment listed in Schedule A, and any other equipment indicated by the County on a time and materials or project basis in accordance with the pricing listed in the Bid Form. All charges for materials, parts and equipment shall be at the Contractor’s cost and reimbursable by the County upon receipt of an invoice per the terms cited in section H. NEW AND CORRECTIVE WORK. The contractor shall provide daily and weekly reports indicating at least the following items: the facilities that will be visited for PM or corrective work under the current Work Order, a schedule of any outage that is required to perform PM or corrective work, a list of the facilities visited the previous week, the work done and the results of these visits, and current status (e.g. normal, alarm) of major systems (e.g. HVAC, UPS) at the facilities.