Specifications include, but are not limited to A.Dusting and Cleaning: The contractor shall dust and clean all horizontal surfaces weekly. Horizontal surfaces include desks, counter tops, chairs,tables, file cabinets, wall-mounted fixtures, picture frames, open space furniture, computer work stations and empty shelves and portions of shelves.B.Door moldings, baseboards, books (tops and spines) should also be dusted.Books do not need to be taken from shelves. All window sills and ledgesshould be dusted weekly. Surfaces shall be free from dust after dusting is completed.C.Trash Removal: All trash shall be removed from public areas, staff office areas and bathrooms. New liners shall be provided weekly or as needed.Spills shall be wiped from trash receptacles weekly. Waste containers and trash receptacles shall be kept clean inside and out. All trash shall be bagged prior to removal from each building. All outside ashtrays shall be emptied every week and absorbent material replaced monthly or as needed.