Specifications include, but are not limited to: The Work consists of the construction of an approximately 260,000sf new high school co-located on the site of the existing Highland Springs High School. The new high school building consists of a structural system with a combination of loadbearing CMU and steel framing. Interior partitions include CMU, drywall and limited amounts of wood veneer paneling. Flooring includes polished concrete, carpet tile, wood sports and stage flooring and rubber floor tile. Roofing systems include EPDM membrane and pre-finished, standing-seam metal roofing. Building features include kitchen with food service equipment, dining commons, a 3-court gymnasium, 1,100 seat auditorium, library, general classrooms, career technical and technology areas, and administration areas.