Specifications include, but are not limited to: The Contractor shall provide all labor, material, equipment, supervision, & incidentals to: Provide mobile on- site yard waste grinding and removal services for the City of Danville of vegetative waste from Hurricane Michael. The approximate volume the piles occupy is 20, 000 loose cubic yards. Since this volume is mostly air, it is a rough calculated tonnage of 3500 tons of biomass. The contractor should make a on- site inspection. The contractor shall propose a method to reprocess or grind the yard waste and remove it from the site. The contractor shall provide an all- inclusive price for mobilization, all equipment, required manpower and supplies to complete the job.