Specifications include, but are not limited to: Relocate office furniture from the work areas; provide all moving materials and tools. Remove shoe molding. Prepare subfloor, apply floor leveler if necessary for a smooth finished surface to prevent any embossed or grout line reveal. Install new laminate flooring in accordance with manufacturer’s instructions. Flooring must extend underneath all door jams and thresholds. No gaps shall be noticeable at the walls, in corners, floor vents, door jams, transition strips or thresholds. Stain shoe molding to match baseboard apply two coats of polyurethane finish and install new shoe molding. Return all office furniture to its original location. Dispose debris and packaging materials daily at the contractors expense. Perform a final clean-up and check of work area upon completion. Straighten up work areas at the close of each day preventing tripping hazards as this office may be called in to support emergency operations after hours.