Specifications include, but are not limited to: • Obtain new cooling tower and install. • Crane cooling tower onto structural support beams and columns and reconnect all utilities; 8” inlet and outlet piping, 2" MPT drain, and 3” MPT Overflow piping, and 2” MPT make-up. Ensure that the chemical treatment feed is reconnected. • Obtain rough-in inspections (if applicable). • Insulate the lines needing insulation to match the existing configuration shown in the earlier images. Use the fiberglass insulation and aluminum jacket to match the existing. Clearly label piping. • Provide updated disconnect devices for the new cooling tower. • Reconnect cooling tower into the appropriate panels (EM). Comply with Electrical codes and standards.