Specifications include, but are not limited to: To procure an on-call professional engineering services Contract from qualified consultants to provide Construction Engineering Inspection (CEI) and related services. This is for various Solicitor projects on an “as needed” basis for either City, State, and/or Federally funded projects. Work awarded by this RFP shall be by individual project assignment including, but not be limited to, the following (Responders should include their understanding of Local, Regional, State, and Federal requirements & capability of delivering these with their response to the RFP): A. CN Permit Monitoring B. Construction Advertisement Specification Development C. Materials Testing D. Quality Assurance Plan Development & Management E. On-site Inspection of project construction such as Roadway, Traffic, Lighting F. Environmental Inspections such as Erosion & Sediment Control, Reports, & Documents G. Vibration Monitoring H. As-built Plans I. Other related design and inspection related work J. Materials Sampling and Testing a) The consultant firm shall provide material testing equipment. The cost of these items should be included in the overhead cost to the consultant and will not be billable to the Solicitor as a direct cost expense, with the exception of the nuclear gauge which shall be provided as a direct cost expense. This equipment will remain the property of the Consultant and shall be removed at completion of the work. The Consultant will be responsible for obtaining proper licenses for equipment and personnel operating equipment when licenses are required. The Consultant shall make the license and supporting documentation available to the Solicitor for verification, upon request. The Consultant's handling of nuclear gauges shall be in compliance with their license. b) The material testing equipment shall include but not be limited to; soil/aggregate compaction kit, including: speedy moisture kit, one-point proctor mold, hammer, gas stove, pans and spoons, scales, 10’ straight edge, sand cone device; slump cone; air meters, non-contact thermometer and 4’ level. Any testing device that will be used for acceptance/rejection of materials will need evidence of calibration as recommended by the manufacturer. All hand tools necessary for inspection services shall also be supplied by the consultant. The Consultant shall furnish all materials, labor, tools, supplies, equipment, transportation and all incidentals necessary for the expeditious completion of the work.