Specifications include, but are not limited to: • Turn on water to system; • Set controllers to proper precipitation rates for • current weather conditions and plant material at each site; • Check all clocks to ensure proper function; • Check the entire system for leaks, broken heads, and malfunctioning valves; • Check all zones to ensure proper intervals and frequencies for each area for effective and efficient operation; • Insure proper operation of back flow prevention devices; • Set/reset all timers to current weather conditions and plant material at site (the Project Officer may submit to the Contractor a list of requested setting for some systems); • Test the entire system under normal operating pressure; • Perform a static pressure test of mainlines and lateral pipes;