Specifications include, but are not limited to: De-terminating, re-labeling, and adding wire ferrules for all monitoring and control signals from all existing HVAC control panels (HCP). 2. Replacing all existing Siemens, panel-level, control panel components with new components that meet the project specifications. 3. Reusing the existing HCP enclosures, incoming power, and field wiring. 4. Removing all front HCP panel components and using blanking panels to seal off the unoccupied locations. 5. Adding new nameplates and print storage data pockets for all HCP enclosures. 6. Upgrading all switches, converters, and cabling to upgrade network to Gigabit speed. 7. Establishing communications on all existing Floor Level Networks (FLN) to fully monitor and control all connected devices. 8. Programming, configuration, testing, start-up, and commissioning of the new HVAC controllers.