Specifications include, but are not limited to: 0010 00100 MOBILIZATION LUMP SUM LUMP SUM _________._____ 513 0020 00102 CONSTRUCTION SURVEYING MIN.-PLAN LUMP SUM LUMP SUM _________._____ 517 0030 00125 GRADING LUMP SUM LUMP SUM _________._____ 303 0040 00128 EXTRA EXCAVATION CY 264.000 _________._____ _________._____ 303 0050 00140 BORROW EXCAVATION CY 1,019.000 _________._____ _________._____ 305 0060 00211 MINOR STRUCTURE EXCAV. PIPE CULVERT CY 2,467.000 _________._____ _________._____ 303 0070 00355 GEOTEXTILE SUBGRADE STABILIZATION SY 900.000 _________._____ _________._____ 305 0080 00507 BEDDING MATL. AGGR. NO. 57 TON 174.000 _________._____ _________._____ ATTD 0090 00523 PRECAST BOX CULVERT DOUBLE 10x6 LF 80.000 _________._____ _________._____ 302 0100 00525 CONCRETE CLASS A3 MISC. CY 52.500 _________._____ _________._____ 302 504 0110 01962 96" CONC. PIPE LF 85.000 _________._____ _________._____ 302 0120 02192 30" X 19" ELLIPTICAL CONC. PIPE LF 21.000 _________._____ _________._____ 302 0130 09148 EROSION CONTROL STONE CLASS A1 EC-1 TON 402.000 _________._____ _________._____