Specifications include, but are not limited to: 0010 00100 MOBILIZATION LUMP SUM LUMP SUM _________._____ 513 0020 00101 CONSTRUCTION SURVEYING CONSTRUCTION LUMP SUM LUMP SUM _________._____ 517 0030 10123 AGGR. BASE MATL. TY. I NO. 21A TON 74.000 _________._____ _________._____ 308 0040 24160 TEMPORARY (CONSTRUCTION) SIGN SF 592.000 _________._____ _________._____ 512 0050 24272 TRUCK MOUNTED ATTENUATOR HR 560.000 _________._____ _________._____ 512 0060 24278 GROUP 2 CHANNELIZING DEVICES DAY 3,500.000 _________._____ _________._____ 512 0070 24279 PORTABLE CHANGEABLE MESSAGE SIGN HR 1,904.000 _________._____ _________._____ 512 0080 24281 ELECTRONIC ARROW BOARD HR 560.000 _________._____ _________._____ 512 0090 24282 FLAGGER SERVICE HR 240.000 _________._____ _________._____ 512 0100 54079 TYPE B CLASS VI CONTRAST PVMT MRKG 4" LF 1,080.000 _________._____ _________._____ 704 0110 54105 ERADICATE EXIST. LINEAR PVMT MARKING LF 1,080.000 _________._____ _________._____ 512 0120 67910 NBIS ACCESS, UNDER BRIDGE STR. NO. 1925 DAY 2.000 _