Specifications include, but are not limited to: a. The contractor shall furnish all labor, materials, supplies and equipment necessary to remove and properly dispose of asbestos-containing material (ACM) and/or contaminated material from: i. Old Highway Building/Hospital Building – 9970001/9970299: a. Remove approximately 700lnft of asbestos-containing TSI material divided from 6 different pipe lines running 116ft located in the underground tunnel between the two facilities. ii. Old Highway Building – 9970001 a. Remove approximately 500lnft of asbestos-containing TSI material located throughout the basement mechanical room of the facility. iii. Annex Building – 9970102 a. Remove approximately 120lnft of asbestos-containing TSI material divided from 2 different pipe lines running 60ft located on the rear wall of the basement mechanical room of the facility. b. Remove approximately 40lnft of asbestos-containing TSI material divided from 2 different pipe lines running 20ft located coming out of steam tunnel into the basement mechanical room of the facility. c. Encapsulate approximately 20sqft of asbestos-containing TSI material on a horizontal duct and on the corners of same in the basement mechanical room of the facility. Work shall be performed neatly without runs in the encapsulate material or spills on the floor.