Specifications include, but are not limited to: A.DEEP RUN PUMP STATION AND FORCE MAIN UPGRADE:a.Upgradeand expandexisting County owned Deep Run Pump Station(PS)from 2.3MGD(Peak)to 6 MGD(Peak).b.Upgrade portion of existing Deep Run Force Main to convey flow from Deep Run PS to City/County Combined Force Main.B.FMC PUMP STATION AND FORCEMAINa.New 1.7 MGD (Peak) FMC WWTP PS to collect and convey FMC local wastewaterto City/County Combined Force Main.b.NewFMC PS Force Main to convey flow from FMC PS to City/County Combined Force Main. Utilize existing 12” force that connects existing Deep Run Force Main to FMC WWTP.C.CITY/COUNTY COMBINED FORCE MAINa.New City/County Combined Force Main that combines and conveys flow from Deep Run PS, FMC PS, and City of Fredericksburg’s Influent Pump Station (IPS) and Force Main to County Owned Massaponax WWTP.b.Total flow contribution from Deep Run PS, FMC PS, andCity IPS conveyed by the Combined Force Main is 27.4 MGD (Peak) and 7.8 MGD (Average).c.New flow control valve at convergence point of City IPS Force Main, Deep Run Force Main, and FMC Force Main.d.New gravity sewer at discharge point of City/County Combined Force Main up to connection with expanded Massaponax WWTP.