Specifications include, but are not limited to: The project is generally described as: Provide all labor, materials, tools, equipment, services, transportation, and incidentals necessary for upgrades at the Airpark Water Storage Tank Pump Station including, but not limited to, the replacement for four (4) pumps, variable frequency drives (VFDs), emergency generator, and automatic transfer switch (ATS). a. Demolition of existing equipment. b. Providing and installing new pumps, motors, and appurtenances for 4 pumps. c. Providing and installing new 75 hp Variable Frequency Drives (VFD) with new line reactors for each pump d. Providing and installing a new Generator with fuel tank. e. Providing and installing a new Concrete Generator Pad and Platform f. Providing and installing a new Automatic Transfer Switch (ATS). g. Providing and installing new wire and conduit.