Specifications include, but are not limited to: 1.The Contractor shall supply all labor, equipment, materials, and supervision or any other item of expense required to perform Aluminum Fence Installation at the Peaceful Village Community. 2.The Contractor will be responsible for having a competent foreman on the job at all times. The contractor will be responsible for the care and handling of materials on the work site. The contractor shall be responsible for any damage to his work or materials from the date of agreement to the date of acceptance of his work and shall make good any damage or loss during that period without additional cost to the Authority. 3. During the contract all materials and workmanship will be required to meet or exceed building codes and standards, and it shall be the Contractor’s responsibility to provide materials and workmanship which meet or exceed these codes and standards. 4. Workmanship shall be first class and of the best quality in accordance with contemporary construction practices. Defective equipment and materials, or damaged materials in the course of installation and testing shall be replaced or repaired in an approved manner at no additional cost to CRHA. 5. Contract work will fall under the provisions HUD-5370-EZ “General Conditions of the Contract of Construction for Small Construction and Development Contracts.”