Specifications include, but are not limited to: The purpose of this RFP is to solicit proposals for the purposes of entering into a contract through competitive negotiations for the professional services of an Engineering firm, authorized to do business in the Commonwealth of Virginia, with experience in the design of and construction phase services for rehabilitation of high hazard earth dams. The A/E shall provide professional services for the project described in Part V of this RFP consistent with the A/E Manual, as revised, and latest directives issued by the Division of Engineering and Buildings concerning construction and professional services for new and renovated State buildings. A. Provide an Environmental Impact Review (EIR), wetland delineation, topographic survey, and geotechnical study of the project area. B. Develop and provide complete drawings with anticipated stages for review at Preliminary and Working Drawings consistent with the requirements of the A/E Manual. Respond to all Department of General Services, Department of Conservation and Recreation, and other agency review comments and resolve outstanding design issues prior to submission of construction documents. C. Provide complete construction contract plans/documents with professional seals and signatures in accord with the procedures of the A/E Manual. D. Assure that the construction contract documents are in conformance with generally accepted engineering practices and comply fully with all applicable codes and regulations including, but not limited to, current Virginia impoundment regulations, and NRCS criteria, guidelines, standards, and specifications. E. Provide specifications which reflect current requirements, standards and product availability. F. Prepare a Stormwater Pollution Prevention Plan (SWPPP) for the project that the contractor will utilize and be responsible for. G. Where applicable, coordinate entrance design with and obtain approval from the Virginia Department of Transportation office having jurisdiction. H. Coordinate the relocation of any utility lines in conflict with proposed improvements. Agency will pay fees and charges, as required. I. Prepare A/E cost estimates for the project per the A/E Manual at the preliminary and final approval stages of design. J. Assist the Agency in presenting any necessary oral and/or graphic presentations to State or County Agencies or any other group having interest in the project. K. Complete all forms and documents in formats required by the A/E Manual and process in accord with the Agency's instructions.