GENERAL 1 513 Mobilization / Demobilization LS 1 $ $ 2 517 Construction Survey LS 1 $ $ 3 105 As-Builts LS 1 $ $ ROADWAY 4 316 8" VDOT Std PR-2 Reinforced Pavement (Trail), Complete, In-Place SF 2,790 $ $ 5 211 Asphalt Concrete Ty. SM-9.5D TON 6 $ $ 6 211 Asphalt Concrete Ty. BM-25.0A TON 18 $ $ 7 208 Aggregate Base, VDOT 21-A, Complete, In-Place, Including Fine Grading Material Type 1, #21A TON 237 $ $ 8 208 VDOT Aggregate Material #1, Complete, In-Place TON 40 $ $ 9 245 Geotextile Subgrade Stabilization, Complete, In-Place SY 320 $ $ 10 217, 502 Concrete Class A3, Complete, In-Place, Including Excavation, Bedding, and Backfill CY 5 $ $ 11 508 Remove and Dispose of Existing Bollards EA 27 $ $ 12 508 Remove and Dispose of Existing Gates EA 2 $ $