Specifications include, but are not limited to: Redevelopment of the surface of the site - generally includes the removal and disposal of existing surfaces, removal and disposal of non-contaminated concrete and bituminous concrete at the City recycle site (Farwell Street), removal and disposal of soils from a limited TCE Hot Spot as RCRA Hazardous Waste, removal and disposal of excess urban soils and removal and disposal of limited Industrial soils to a certified landfill, and installation of new gravel subbase, grading, drainage, pavement, curbing, concrete sidewalk, parking lighting, line stripping, signage, parking meter sleeves, traffic/stormwater control during construction, etc. for the complete installation of the work. A Corrective Action Plan (CAP) has been approved for this site.