Specifications include, but are not limited to: Perform a comprehensive assessment of dry-weather flows from storm drain outfalls and other discharge points in the described study area for the presence of illicit discharges. The project team will meet or contact each town’s public works staff/Heath Officer or Town Road Foreman before field work begins to plan the assessment phase in detail. The assessment includes recording observations and performing basic water quality tests at flowing outfalls and other discharge points, and in selected catchbasins and junction manholes within larger closed drainage systems. The recently completed stormwater infrastructure mapping will be used to guide the extent of this effort.