Specifications include, but are not limited to: 1.The chosen contractor shall provide the Owner with a detailed schedule of work prior to mobilization to the site. 2.Mobilization to and from the site with all necessary materials, equipment, supplies and laborers to complete the entire job, within the timeframe. 3.Replace approximately 35’ of existing 4” cast iron sewer line with 4” SDR 35 PVC sewer line. The line runs from the shower building to the existing wye with the toilet building sewer. All cast iron will be replaced to where it converts to PVC. 4.Replace approximately 180’ of ¾” galvanized waterline with 1” CTS HDPE tubing. Brass compression fittings and insert stiffeners are to be used at connections. Connections to the existing ¾” galvanized waterline and to the existing CTS tubing will be required. 5.Pressure and leakage testing, disinfection and bacteriological testing, in accordance with VT Environmental Protection Rules, of the CTS waterline will be required prior to being put into use.