Specifications include, but are not limited to: 1. Demo/remove epoxy flooring in specified areas. 2. Assess and mechanically prepare until a solid slab/substrate is found. 3. Flash fill any areas in order to bring floor up to needed height for epoxy covering. 4. Epoxy covering and repairing of integral/vertical coves where cracked/damage has occurred 5. Toilet can be removed and reinstalled by City of Burlington in coordination with flooring contractor. 6. Submission of written proposal with ability to be signed by both parties. 7. Perform work in accordance with applicable rules, regulations, codes, and ordinances of local, state and federal authorities, and in accordance with the requirements of public utility corporations having jurisdiction over the work.