Specifications include, but are not limited to: 1. Demolition and removal off site of existing: a.) Power to equipment involved with this project. b.) Pumps: Three (3) existing pumps. c.) Cooling tower. d.) Portions of boiler piping that cannot be reused. e.) Boilers: Five (5) existing boilers, circulators and associated appurtenances not being reused. 2. New Work: Contractor shall provide, rig, and properly install the following new equipment: a.) Boilers: Five (5) Aerco AM 500 boilers with boiler pumps, gas valves, and all appurtenances. b.) Piping, valves, etc., associated with boilers. c.) Boiler condensate cpvc piping to floor drain. d.) Insulation on heat piping. e.) Cooling Tower: Evapco LSWA 61B with integral spray pump, controls and variable speed VFD and all appurtenances. f.) Circulating pumps: Three new Grundfos VLSE 5012A. g.) Dirt and Air Eliminator: Spirotherm Spiro-vent, 6”. h.) Glycol Tanks and Pumps: Two (2) 30-gallon Axiom MF 300 Glycol tanks with auto pump, piped to loop piping. i.) Make-up Water Assemblies: Two (2) with Watts PRVs and BFPs. j.) Factory Rep. inspection, startup and adjustment of all new equipment. k.) Electrical: i.) Provide and install new power to all new mechanical items. ii.) All new wiring shall be in steel conduit back to existing breaker panel. iii.) Provide new disconnects. iv.) Provide new breakers for all new equipment. l.) Start up services m.) Miscellaneous required items.