Specifications include, but are not limited to: 1) Removal of all parts of the existing concrete dam, as outlined in the final engineering plans and construction sequence provided by Ripple Natural Resources, LLC (dated March 2019). 2) Disposal of all concrete, steel reinforcement, timber, and any other material generated form the dam removal at an off-site location in compliance with all federal, state and local requirements. 3) Install temporary erosion control and demarcation fence flagging to delineate work area. 4) Make a reasonable effort to work outside of flowing water, and to limit the discharge of turbid water. 5) Establish appropriate access to the dam site off Tucker Reed Rd, as needed. This may include a crushed gravel course for stability and to prevent rutting, erosion, and tracking of material offsite. 6) At completion of work, restoration of any construction/site access, staging, and work areas of preconstruction conditions