Specifications include, but are not limited to: In general, the scope of this project will consist of the following items: A. Project Kick-off Meeting B. Development of Table of Contents C. Development of Design Standards and Specifications to include, but not be limited to, the following section headings: a. General Requirements b. Earthwork Specifications c. Surveying and Mapping i. As-Built Standards d. Grading and Erosion Control e. General Slope Stability (including bioengineered approach for shoreline stabilization) f. General Soil Management g. Water System h. Wastewater Collection System and Pump Stations i. Stormwater system j. Streets and Roadways k. Street Lighting l. Parks Lighting m. Curbs and Sidewalks n. Crosswalks o. Bike Facilities (DPW and BPRW) p. Landscaping q. Stormwater Management and Erosion Prevention and Sediment Control (EPSC) i. Pre-construction Requirements ii. Construction Requirements iii. Operational/Post-Construction Requirements r. Tree Protection and Tree Pruning s. Site Furnishings t. Fencing u. Traffic Plans and Traffic Control v. Electrical Supply (BED-owned utilities) w. Electrical Services (Customer-owned and under jurisdiction of City wire inspector) x. Inspection and Material Testing y. Measurement and Payment D. Development of preliminary standards and specifications for review by the City E. Development of revised preliminary standards and specifications for review by the City F. Development of final standards and specifications G. Meetings with City staff to obtain feedback at various stages H. Development of CADD drawings (to be provided to the City in AutoCAD format) to supplement the specifications I. Review of existing ordinances, manuals, codes, forms, checklists, and other existing standards to support the development of the new standards for the City J. Recommendations of standards