Specifications include, but are not limited to: 1.Existing pit toilets shall be pumped if required, and contents shall be disposed of by a licensed septic disposal contractor. Once empty the existing vault(s) and associated structures shall be removed and disposed of by contractor. Site then will be back filled, top dressed with 4” of top soil, seeded using AOT rural area mix as shown on attached specification sheet. 2.New tank areas will be excavated and prepped as shown on attached tank detail plan to accommodate 2 new 7’ x 13’ x 60” concrete containment tanks as specified in the detail plans. Location to be determined by State Project Manager. 3.All excavation work to be completed in accordance with VT AOT Standards. Excavation will be made to such dimensions and coordinates as shown on the contract project engineering plans / drawings.