Specifications include, but are not limited to: • All areas need to be verified by the proposer; • Remove existing roofing materials and properly dispose, as needed; • Removal and disposal of all waste materials; • Install 2 layers of insulation for an equivalent of R-30 to the existing roof or that needed to meet present building code; • Place new .060 TPO white membrane mechanically fastened roof; • Install ½” protection board on wall and flash all wall per manufactures recommendations; • Install wood blocking at perimeters to meet insulation height; • Place flashing on all penetrations per the manufacturers recommendation; • Install metal drip edge at perimeter on three sides and flash into new roof. On lower edge install new drip edge and hook a piece of TPO metal over , weld membrane to TPO metal or as recommended by the contractor; • All communication, scheduling and coordination with BTV and; • Provide construction warranty and required manufactures inspections with a minimum 20 year warranty.