Specifications include, but are not limited to: 1. Contractor shall furnish and install the following gates at the following locations: 1. Alburgh Dunes State Park (151 Coon Point Road, Alburgh, VT) i. One solar-powered barrier arm gate with free exit loop. Barrier arm gate system to be a Strong Arm Park DC14 or approved equivalent. 1. Gate system shall be located at park exit, in location staked out by the State. 2. Gate arm shall be a minimum of 14 feet. 3. Contractor shall install a 2x2 concrete pad for gate system set a minimum of 36” deep. 4. Gate system shall include a 4x8 free exit loop to be buried in gravel drive. 5. Solar kit shall include 2 20 watt 12v solar panels. 2. Lake Carmi State Park (460 Marsh Farm Road, Franklin, VT) i. One Strong Arm Park DC10 or approved equivalent barrier gate system to replace current entry gate. 1. Gate to be placed in same location as current gate. 2. Gate arm shall be a minimum of 10 feet. 3. Gate system shall include key pad on entrance side that allows for key coded entry.