Loading...
Skip to main content
< Back to results

2020 Spring Paving


Location
Vermont
Publication Date
03/02/2020 07:06 AM EST
Closing Date
03/16/2020 02:00 PM EDT
Issuing Organization
Town of Hyde Park
Solicitation Number
Description

Specifications include, but are not limited to: 1. All traffic control during construction 2. Construction signage in accordance with MUTCD 3. Surface temperature of existing pavement to be 45 degrees and air temp to be 40 degrees and rising at the time new asphalt is applied. 4. Saw cut begin and end locations as marked by the Town 5. Removal of existing pavement and compaction and leveling of base gravel material 6. Placement of a base course of Type III and a wearing course of Type IV bituminous concrete as described herein. 7. Access to the residences and businesses must be maintained at all times. 8. Rubber tire roller on shim coat and no less than 10-ton roller on top coat.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids